Dispelling the Myths of Permitting Reform and Identifying Effective Pathways Forward

Four myths are distorting the national debate over permit reform. First, it is misconceived as a singular issue, with the National Environmental Policy Act (NEPA) at its center. Second, reformers assume that federal reviews and permitting cause most project delays and failures. Third, there is a widespread belief that environmental laws are routinely weaponized against new infrastructure through obstructive litigation. Fourth, critics assert that environmental procedures and standards must be sacrificed to enable timely climate action.

Regulating Shipping of Carbon Dioxide for Sequestration

A number of facilities intended for permanent sequestration of carbon dioxide are being developed in the United States. Several will be located on or near the coast of the Gulf of Mexico, making them easily accessible to ships. Meanwhile, in Europe there is substantial interest in capturing carbon dioxide from industrial operations, but currently inadequate sequestration facilities, and growing interest in shipping carbon dioxide for sequestration in the United States. This Article reviews the main U.S.

Natural Resource Damages Under CERCLA and OPA

Natural resource damages (NRD) under federal law is a statutory cause of action to compensate for injury to natural resources resulting from releases of hazardous substances or oil. Designated officials are authorized under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Oil Pollution Act (OPA), among others, to act as “trustees” on behalf of the public or tribes.

Strengthening Superfund Cleanups With Land Use Institutional Controls

The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) established the “Superfund,” which allows the U.S. Environmental Protection Agency (EPA) to clean up contaminated sites. It also forces the parties responsible for contamination to either perform cleanups or reimburse the government for the EPA-led cleanup work. The Superfund program relies on several tools to protect against lasting contamination.

NEPA Litigation Over Large Energy and Transport Infrastructure Projects

Despite five decades of experience, there is a considerable gap in legal and empirical study on the impacts of the National Environmental Policy Act (NEPA). Proponents of reform often claim NEPA litigation is a major obstacle for federal actions; others have concluded litigation is not a major contributor of project cost escalation or delays. This Article studies the incidence and conditions of infrastructure project litigation under NEPA, using a data set of 355 major transportation and energy infrastructure projects that completed a federal environmental study between 2010 and 2018.

The Oak Ridge Cleanup: Protecting the Public or the Polluter?

The Oak Ridge Reservation is one of the largest U.S. Department of Energy (DOE) facilities in the country, with areas that are highly contaminated by chemicals, metals, and radionuclides. DOE is in the middle of a multi-decade, multi-billion-dollar cleanup there, and a recent Superfund decision for one portion of the site raises a number of significant legal issues. This Article addresses some related questions: Should radionuclides get less stringent cleanup than other equally harmful pollutants like mercury and polychlorinated biphenyls?

Playing the Long Game: Expediting Permitting Without Compromising Protections

The Biden Administration’s efforts to promote clean energy have prompted calls for permit reform. A clean energy economy demands a global increase in mineral production, and some suggest environmental standards must be loosened. This premise fails to distinguish among causes of delay in the permitting process, and increased demand for minerals should not overshadow the productive purposes served by permitting. At the same time, there are opportunities to improve permitting without compromising health and safety standards.

Achieving “Some” Upfront Certainty and Resolve in Superfund Settlements

Superfund practitioners are waiting to see whether the U.S. Environmental Protection Agency (EPA) will designate perfluorooctanoic acid and perfluorooctane sulfonate, two chemicals in the per- and polyfluoroalkyl substances (PFAS) group, as CERCLA hazardous substances. Such a designation may lead to selected remedies being modified and further work being required at Superfund sites where remedies were believed to be complete. This Article explores potential future liability by reviewing provisions of the 2021 Remedial Design/Remedial Action (RD/RA) Model Consent Decree.

Amending the NEPA Regulations

The Joe Biden Administration has proposed reversing a number of the Donald Trump Administration’s changes to the National Environmental Policy Act (NEPA) regulations by again requiring federal agencies to evaluate the direct, indirect, and cumulative environmental impacts of projects under environmental review. On April 20, 2022, the first phase of those amendments was finalized, and on April 21, the Environmental Law Institute hosted a panel of experts to explore the changes to NEPA implementation, and how they might impact climate change policy and environmental justice.

NEPA’s Trajectory: Our Waning Environmental Charter From Nixon to Trump?

Heralded in 1970 as the nation’s environmental Magna Carta, the National Environmental Policy Act’s (NEPA’s) luster seems faded and its future uncertain. While Trump Administration initiatives threaten to diminish further and perhaps even dismantle aspects of NEPA, this Article chronicles how the current assault merely continues NEPA’s unfortunate trajectory, examining how the courts, the U.S. Congress, and the executive branch each have whittled away at the Act. NEPA consequently sits at a critical juncture: it could soon fade away or it could hew back toward its original promise.