United States v. Metropolitan St. Louis Sewer District

A proposed amendment to a 2012 consent decree allows settling CWA defendants to replace two combined sewer overflow (CSO) storage tunnels with one larger CSO storage tunnel to accommodate overflows from all of the outfalls related to the original two CSO storage tunnels.

You must be an ELR subscriber to access the full content.

You are not logged in. To access this content: