United States v. Akron, Ohio, City of

A proposed amendment to a consent decree concerning operation of a municipal wastewater treatment facility and sewer system in violation of the CWA requires the settling defendant to resize a large tunnel (the Northside Interceptor Tunnel) from 23 million gallons to 10.3 million gallons and add a new requirement for sewer separation at one of its combined sewer overflow discharge points that would otherwise be controlled by the Northside Interceptor Tunnel.

You must be an ELR subscriber to access the full content.

You are not logged in. To access this content: