Crossed Wires and Split Circuits: Transmission Rights of First Refusal
Author
Alessandra Papa
Author Bios (long)

Alessandra Papa is a 2023 J.D. candidate at the University of Texas School of Law.

Date
May 2023
Volume
53
Issue
5
Page
10372
Type
Comment(s)
Summary

As population growth and increased electrification rapidly raise demand for power, U.S. electric grids are struggling to keep pace, and the need for more transmission capacity is pressing. The U.S. Congress has delegated its interstate commerce authority to the Federal Energy Regulatory Commission to regulate interstate transmission rates. Meanwhile, states regulate intrastate transmission rates. What is perhaps surprising, though, is the fact that states generally have authority over the siting and construction of interstate transmission lines. This complex division of jurisdiction means that states have a certain level of control over the future of interstate transmission, which can (and has) led to questions of exactly where a state’s authority ends. Some states have tested this boundary more than others—with mixed results. This Comment analyzes recent challenges to Minnesota and Texas laws that have led to a current circuit split as to the constitutionality of state restrictions on transmission buildout.

You must be an ELR subscriber to access the full content.

You are not logged in. To access this content: